At Ridgemont Drive, Eidson Builders successfully completed a comprehensive driveway extension, measuring 16 feet wide by 12 feet long, which included the installation of footers for carport posts. The project involved the demolition of the old driveway and sidewalk, followed by the re-pouring of the gutter and curb to ensure a seamless transition. Additionally, a new approach with a curb cut was created, and the parking area was expanded by adding two feet on each side, enhancing both functionality and aesthetics. Throughout the process, meticulous attention was given to site preparation and utility installations, resulting in a beautifully finished driveway that complements the home’s exterior.
Gallery
This project was completed in
Austin, TX →